Tidewater Home Improvement LLC
Scope of Work & Estimate
320 Atlantic Ave, Hampton, VA
Estimate #1418
Jeff Wilson — text or call 757-322-7171
$6,530.42 Garage Water Management · 50/50 payments
320 Atlantic Ave, Hampton, VA
Trench Guard 18 LF · Discharge Line 179 LF · French Drain 26 LF · 2 Pop-Ups · 2 Downspout Extensions
View PDF — Estimate #1418 Accept & Pay Deposit View All Project Photos Jeff Wilson — text or call 757-322-7171 Estimate valid until 10/02/2026
Project Overview
Customer: Nita Philip
Project: Garage Water Management — Drainage
Address: 320 Atlantic Ave, Hampton, VA
Estimate #: 1418
Date: 09/25/2026
Area of work: garage door front & the back exterior wall of the garage
Scope of Work — Included
  • Trench Guard System — 18 linear ft at the garage doorThe channel and grate are set across the full width of the garage opening to catch the water that comes down the driveway and turn it away before it reaches the door.
  • Discharge Line — 179 linear ft around the back exterior wall of the garageSolid pipe runs the collected water around the back wall of the garage and away from the house. Gravity fed — no pump.
  • Exterior French Drain — 26 linear ft with two pop-upsA 4 in. perforated pipe in a cloth sleeve, set in #57 gravel along the outside of the wall, graded so ground water is carried away from the wall. Two pop-up emitters let the water out at the ends of the run.
  • Downspout Extensions — 2 downspouts, back exterior wall of the garageTwo downspout extensions take the roof water off the wall and into the discharge line instead of dropping it at the foundation.
  • General ConditionsMobilization, protection of the work area, material runs and daily clean-up through the project.
Total Project Cost$7,256.02
10% Customer Discount−$725.60
Total$6,530.42
Site Photos — Before Work
Payment Schedule
Deposit to Schedule
$3,265.21
Upon signing
Final Payment
$3,265.21
Upon completion
Total Project Cost: $7,256.02 · 10% Customer Discount: −$725.60 · Total: $6,530.42 · Check is a preferred method · Pay by credit card: request.plastiq.com/pay-tidewater-home-improvement-llc (Virtual Affirm credit card not eligible)
Terms & Conditions

Scope: install 18 linear ft of trench guard system across the front of the garage door; install 179 linear ft of discharge line around the back exterior wall of the garage; install a 26 linear ft exterior french drain with two pop-up emitters; install two downspout extensions on the back exterior wall of the garage; general conditions for the drainage work.

Notes: all of this work is gravity fed — no sump pumps. Ground settles where it is disturbed; final grading and grass are the owner's to finish. Contractor is not responsible for damage caused inside the home while working on the exterior.

Warranty: 12 months workmanship on the work performed; 12 months on the drainage system.

Not included: any crawlspace work — no vapor barrier, no encapsulation and no dehumidifier; no sump pump; no electrical work; no structural repair to the house; gutter work beyond the two downspout extensions listed; any repair to driveway, concrete, paint or finish surfaces; any work not listed in the scope above.

Payment: Total Project Cost $7,256.02 · 10% Customer Discount −$725.60 · Total $6,530.42 · Deposit to schedule $3,265.21 · Final payment $3,265.21.

Validity: valid until 10/02/2026.